// RAZEFORCE · CASE STUDIES

REAL PROJECTS.
REAL RESULTS.

Case studies from contractors who have used Razeforce on real demolition projects worldwide.

// PUBLISHED CASES
CASE STUDY · UK

14-Storey RC Tower — Brentford

Demolition contractor reduced quotation time from 9 days to 6 hours. Bid pack with 3D animation won the contract over two larger competitors.

CASE STUDY · India

Industrial Chimney Stack — Pune

Remote structural analysis identified undocumented reinforcement. Method adjusted before mobilisation. Zero structural incidents.

CASE STUDY · Nigeria

7-Building Hospital Complex — Lagos

Crew training modules deployed in 3 languages. Toolbox talk library reduced near-miss rate by 40% over a 6-month programme.

CASE STUDY · Spain

Underground Car Park — Madrid

Compliance agent filed 14 regulatory returns across 3 jurisdictions automatically over 8 months without a single manual submission.

CASE STUDY · Australia

Coastal Industrial Plant — Perth

Fleet monitoring agent reduced fuel overconsumption by 18% and flagged a hydraulic failure 72 hours before it would have caused a major incident.

CASE STUDY · UAE

Tower Block Implosion — Dubai

3D phasing simulation submitted to municipality for approval. First time a demolition contractor had submitted an animated method for that authority.

BE THE NEXT CASE STUDY.

Start with a free job and see what Razeforce delivers for your project. Design partners get 6 months free in exchange for a published case study.

Start Free Trial →